Case Studies: STAMFORD

Where: Western Australia Specified: 28 x STAMFORD P80 alternators Purpose: Alternators required for 58 MW power plant at a remote iron ore mining site Contract Power Group has its roots in Western Australia, where it has become a pioneer in the power generation equipment sector. Since the 1990s the company has been providing remote on-site servicing and 24-hour call-out to mining… Learn More

A recent enquiry to Cummins Generator Technologies led to the discovery of the pictured generator set above featuring a 21 kVA STAMFORD alternator. This unit was built in Stamford, UK, during February 1985 and sent to Newage Engineers Australia and from the information we have, it was then delivered to its current location where it… Learn More

Where: Colombia Specified: 2 x STAMFORD® P80 alternators to meet a 2.5MW power requirement Purpose: To provide reliable power to one of the most important Oil & Gas sites in Colombia for a major oil customer A continuous power requirement in Colombia’s oil sector is being met by STAMFORD® P80 alternators. Specialist generator set manufacturer IGSA from Mexico specified the premium alternators… Learn More

Where: Nickel-Cobalt mining and processing plant, Madagascar Specified: 30 x STAMFORD® P7 alternators for use in 1,250 kVA generator sets Purpose: Delivering 37.5 MVA of reliable power to the site, operating 24/7 for the anticipated project life of 27 years The largest capital project in the history of Madagascar, the Ambatovy Project, has deployed generator… Learn More

A Russian generator set supplier keen to increase its business with oil and gas clients has scored a success with Gazprom after specifying STAMFORD alternators for its standby application units.

Learn More
Archives by Month
sign up to receive our bi-monthly newsletter